More work done

SM2NOG showed up on Saturday with a concrete blender which we used to mix up concrete for the base. A couple of hours later the base was done and we did also make the concrete base for the 18m tower.

On Sunday evening the excavator showed up and we filled up the anchor holes for the 60m tower but also dug and finished the guy wire anchors for the 18m tower and the 160m vertical. So now all the digging needing to be done this season has been done.

Big thanks to SM3SGP who left on Monday but was here and helped me out for almost a week!

On Monday evening I mixed the concrete for the pillar and now the base is pretty much done. Now the concrete need some time to get hard and after that we can drill down the expander bolts holding the tower base.

Here are some pictures

Comments are closed.