60m tower preparations

SM3JLA joined me for a weekend and helped me lay out the tower pieces and helped to screw them together. SM2NOG also showed up and drilled the holes in the tower base. The weekend after SM2LIY showed up with some chemical concrete fixture which SM2NOG had gotten for us which we used to get the bolts stuck in the concrete base. After that I noticed that somehow the base wasn’t perfectly leveled so I had to add a little concrete to level it out.

Here are some pictures of the stuff that happened…