A little update

Last weekend some more things got done at SJ2W. On Friday me and SM2XJP paid SM2DMU a visit. We picked up a bearing which is used as a guy wire ring. He used it on one of his towers but unfortunately it fell down a few years ago and one of the rings was left over since the parts of the tower that weren’t damaged, was enough to be guyed at one level. Thus we could take it and I will drill a few new holes in it to match our current tower. So we thank Rainer a lot for giving us that guy wire ring along with 10 pcs of M12 A4 stainless steel threaded rods.

I also noticed that when I drilled 15mm holes in the H-beams it was too small. I thought it was M14 but unfortunately it was M16, so now I have taken them up to work again where I will drill the holes bigger so it fits properly.

I also got some work on the house done and hopefully in a couple of weekends it will be done for this year and it will be all radio work from now on.

I left my phone at SJ2W, so I might be hard to get in touch with until Friday when I will be back. That also means no pictures, since I use the phone to take them.

Today I built a preamp with a GALI-74+ amplifier from mini-circuits. It seem to work well, about 24dB amplification and according to the specifications it should have 2.7dB Noise-Figure and IP3 of +38dBm. That is specified at 1 GHz though, I am not sure what we can see at 1-30 MHz, but hopefully it works well. I have also gotten all the 500m of RG-6 that I ordered so now we will put up a vertical about 600m from the TX antennas and see how much QRM we get when listening on the same band as the run station.

To be continued…

House and grounding

Here are some pictures from last weekend when me and the girlfriend worked on the house. She did the painting while I was working on the house. On Sunday SM2XJP showed up and helped out to do a lot of hammering so now the only things left to do is to move the windows out, the details around the windows and paneling above and under the windows, so the big work is finally done.

I bought a tent which was pretty OK for the price, and after a roll of isolation tape its even pretty good. This way I can work outside with welding etc even if its raining and it was also a big help when painting.

I also did attach the guy wires to the grounding system.

(Sorry for the bad quality on the pictures)

Progress on the tower base

I’ve done some progress on the tower base lately. A few of the pictures below are old but they were taken by SM2XJP and they are quite nice, so I thought I’d add them. I also did drill all the holes needed in the H-beams for mounting them to the bearing. It went pretty ok, we’ve got quite good tools at work but I needed to buy a 28mm drill since we didn’t have such a big one.

Now I will transport them down to SJ2W next weekend and test if they fit as they are supposed to. If they do I will weld it.

House and tower work

Now my vacation is over and I am back in LuleƄ at the work QTH. We managed to get some stuff done though. Three sides of the house is not very far from done, a couple of more weekends and then that should be fine. I also started to do work on the base for the 40m military tower project. I basically just cut the H-beam in half and planned how to construct it plus took lots of measurements. I took the H-beam and some other parts with me up to LuleƄ where I have tools to drill the big holes.

I am in need of a 300mm long 60mm thick round bar, if anybody has got one lying around. Thicker is fine too since I still need to machine it.