Gallery – 2010

20100108_openASC

4 Photos

stackboxes_1

Building the powersplitters for the station

7 Photos

6x2_1

Building the 6x2 with 7/16" connectors for the station

8 Photos

6x2_measurements

Measurements of the 6x2 switch with 7/16" connectors

27 Photos

powersplit_1

Powersplit prototype built

9 Photos

cq160m_2010

20 Photos

40m_vhp_lp_filt1

QRO LP filter for 40m

6 Photos

20100227

Pix of the some homebrewing

7 Photos

20100305

17 Photos

powermeter_pckup

4 Photos

20100317_openASC

Panels for the openASC boxes milled.

7 Photos

20100328

Snow snow snow

19 Photos

20100404_openASC

openASC development

5 Photos

20100419

20m yagi work

8 Photos

20100417

Various stuff being done outside

10 Photos

20100420

Some work done on the phase box for the 20m stack

10 Photos

20100424

Work in the switch room and also some work on the 20m yagi

16 Photos

20100425

Fixed 80m vert and cable mess

7 Photos

20100422_openASC

Some pictures of openASC

11 Photos

20100429

Some EMC tests of openASC

6 Photos

20100430

19 Photos

20100508

Doing beverage work in the forrest

7 Photos

20100523

Some work done at SJ2W

14 Photos

openASC_general_io

General I/O card designed primary for SK3W station

2 Photos

20100528

Taking down the last stuff at the old SM3 QTH

17 Photos

20100605

Outside work, mostly with the 18m tower

26 Photos

20100606

Put up the 18m tower

18 Photos

20100613

Various work done, mostly in 18m tower and assembly of a 15m yagi

43 Photos

20100619

24 Photos

20m_l_match

L-match built for 20m

10 Photos

20100702

15m 5el mono up

7 Photos

20100708

Work on the 4el for 20m

21 Photos

iaru_2010

Pictures from the hoist of the 2nd 6el yagi for 20m. We also did work IARU as SK9HQ on 20m SSB and made over 3500 qsos.

34 Photos

40m_yagi_build1

Building the top 3el 40m yagi

18 Photos

40m_yagi_build2

18 Photos

40m_yagi_build3

The last day of building the 40m yagi

23 Photos

40m_yagi_build4

SM3JLA pix of the 40m beam build

10 Photos

20100804

Some various pictures

13 Photos

20100816

6/6/6el stack complete for 20m

6 Photos

20100821

Connected the phase box for the 20m stack

5 Photos

20100829

160m vert finished

17 Photos

20100926

Finished the 6/6el stack for 15m

31 Photos

20100929

Power meter and L-match

9 Photos

20101005

L match for 15m

4 Photos

sacssb10

Scandinavian Activity Contest SSB 2010

13 Photos

notch_filter_20m

20m notch filter W2VJN design

6 Photos

4cx1500b_amp_1

2x4CX1500B amp part 1

14 Photos

20101016

Fixed the 3el for 40m

21 Photos

20101024

CQWW DX SSB 2010 SO2R setup

7 Photos

20101025

Work out in the switch room

13 Photos

4cx1500b_amp_2

More of the 2x4CX1500B amp

8 Photos

4cx1500b_amp_3

2x4CX1500B amp

16 Photos

cqwwcw2010

CQWW DX CW 2010

14 Photos

20101128_2

CQWW DX CW 2010 #2

18 Photos

4cx1500b_amp_4

Part four of the 2x4CX1500B amplifier

10 Photos