SM3SGP arrived!

I haven’t updated the page for a while, sorry about that. Anyway, a lot of work has been done lately. First we had the field day (which I will post pictures from later) and after that SM3SGP showed up after his trip up north for SM2EKMs wedding. Gus stayed for several days and helped out a lot with preparations for the 60m tower lift.

First we went to get material so that we could start making the concrete base for the 60m tower. After that we leveled out the ground in the pit, added the isolation in the bottom and made a form for the concrete base which the pilar would stand on. When that was done we did some work lying down isolation above the guy wire anchor points for the 60m tower and lowered down the rebar cage which I put together earlier during the week.

Comments are closed.